Tender Weld Documentation Checklist
Checks that the welding documents in a tender or prequalification show a controlled welding system a reviewer can verify.
Free Checklist ยท Shutdown Planning
Confirms a weld repair is defined well enough to be priced, planned and released inside a shutdown window, before the scope goes to contractors.
Maintenance planners, shutdown coordinators and reliability engineers on mine, quarry and process plant, and the contractors who price the work.
Work through it while the scope is still on paper, at least one planning cycle before the shutdown. Mark each item Y, N or N/A and note the evidence you sighted. Every N is closed before the scope is issued, or written into the scope as an assumption, a hold point or an exclusion.
General guidance only. It is not engineering advice for a specific asset and does not replace the drawings, the contract specification, the standards that apply, the site's own procedures or advice from a qualified person. Standards are named as pointers. Clause references are to AS/NZS 1554.1:2014. Work to the edition your contract names, read from your own licensed copy.
More Free Checklists
Checks that the welding documents in a tender or prequalification show a controlled welding system a reviewer can verify.
The records to hold before, during and after a weld repair on mine plant, so the machine goes back with a complete file.
One consistent way to rate and record the visible condition of steel structures, so each inspection compares with the last.
Related Services
Shutdown Coming Up
Send the defect list and the shutdown dates. We will tell you what each repair needs defined before it is priced.